Pilot timber-hybrid wind turbine tower installed in Austria

pipeline incident expired 92% Energy

Hasslacher Green Tower installed a 36-metre pilot timber-hybrid tower for a wind turbine in Stall im Mölltal, Austria. The installation demonstrates a design combining timber with other materials for wind energy infrastructure.

🌐 Location: Stall im Mölltal — Sources: 1 — First seen: — Last seen:
wind turbine timber hybrid pilot tower renewable energy Austria

Contributing Articles