RM600,000 steel bridge to improve access for 13 families in Durin

🌐 Borneo Post (MY) —
RM600,000 steel bridge to improve access for 13 families in Durin

AI Summary

A RM600,000 steel bridge, 30 metres long and 3.65 metres wide, will be constructed in Durin to improve access for 13 families. The federally funded project is planned to begin after the Gawai Dayak festival in Sarawak, Malaysia.

SIBU (June 2): A RM600,000 steel bridge measuring 30 metres in length and 3.65 metres in width will be constructed at Rumah Peter Anthony in Durin near here, according to Sarawak United Peoples’ Party (SUPP) Dudong branch chairman Wong Ching Yong. He said the federally funded project is scheduled to begin after the Gawai Dayak [...] The post RM600,000 steel bridge to improve access for 13 families in Durin appeared first on Borneo Post Online.

Deals Real Estate Malaysia Durin steel bridge infrastructure federal funding access improvement

Read original source →