Bow string steel bridge near Tiruchi Junction to be moved into position soon
AI Summary
A bow string steel bridge near Tiruchi Junction is set to be moved into position soon using a 700-tonne heavy capacity crane. The pre-fabricated structure weighs about 650 tonnes and its launching marks a major step in constructing the new overbridge.
The launching of the pre-fabricated structure would mark a significant milestone in the construction of the new overbridge; a heavy-capacity 700-tonne crane would be deployed for moving into place the steel structure weighing about 650 tonnes
Markets Real Estate bridge construction Tiruchi Junction steel bridge prefabricated structure crane infrastructure